Earthquake-Prepared Water Pumping Station for Municipal Resilience

QCAi Ready for the Shake

A Case Study on Vendor’s Earthquake-Prepared Water Pumping Station for Municipal Resilience

– Case Description | Company Challenge 

Designing and building a SCADA (Supervisory Control and Data Acquisition) solution with remote terminal unit (RTU) communications to control assets that pump water over 70 blocks in the event of an earthquake presents several challenges.

QCA Systems played a crucial role in designing and building a SCADA (Supervisory Control and Data Acquisition) solution with Remote Terminal Units (RTUs) to control assets that pump water over 70 blocks in the event of an earthquake

Thanks to QCA Systems, our municipality now has a state-of-the-art water pumping station that can withstand seismic events. Their collaborative approach, attention to detail, and focus on our specific needs have made this project a success. We highly recommend their services for any municipality seeking earthquake preparedness solutions.

Head Engineer

Engineering and Maintenance Department

– Here are some common challenges faced in this regard:

Designing a SCADA system for earthquake-prone areas requires special attention to seismic considerations. The system and its components, including RTUs and communication infrastructure, need to be designed and built to withstand potential ground motions and vibrations during an earthquake. This involves selecting robust equipment, implementing proper grounding techniques, and considering structural reinforcements for housing and mounting.

Establishing a reliable communication infrastructure is crucial for ensuring seamless communication between the SCADA system and the RTUs. In an earthquake scenario, communication networks can be severely affected, with disruptions or damages to wired or wireless connections. Building a resilient communication network that can withstand physical damage and maintain connectivity during and after an earthquake is a significant challenge.

Power supply interruptions are common during earthquakes due to damaged power lines or infrastructure. Designing a SCADA system with power supply redundancy is essential to ensure continuous operation of the system and control over the assets that pump water. This may involve implementing backup power sources such as generators or battery backup systems to keep the SCADA system and RTUs functional during power outages.

SCADA systems rely on continuous monitoring of various parameters to ensure optimal control over assets. In an earthquake scenario, monitoring and fault detection become even more critical. The SCADA system should be equipped with sensors and algorithms capable of detecting seismic activity, asset damage, leaks, or any other anomalies that may occur during an earthquake. Real-time data analysis and automated alert systems are essential for prompt response and mitigation of potential issues.

To ensure uninterrupted control over assets, redundancy and failover mechanisms should be implemented. Redundant RTUs and communication paths can provide backup control options in the event of primary system failures or damages. Redundancy can help mitigate the impact of equipment failures or communication disruptions caused by earthquakes.

Designing the SCADA system to facilitate rapid response and emergency protocols is crucial. This includes implementing emergency shutdown procedures, automating valve control for isolation purposes, and integrating the system with earthquake early warning systems for immediate actions. The system should be capable of responding swiftly and reliably to safeguard the assets and minimize potential damage.

Validating the SCADA system’s performance and resilience in simulated earthquake scenarios is essential. Thorough testing, including simulation exercises, can help identify weaknesses, refine response strategies, and ensure the system performs as intended during real earthquake events.

water pumping station
Ready for the Shake: A Case Study on Vendor's Earthquake-Prepared Water Pumping Station for Municipal Resilience

Company Overview

The customer is a city municipality located in British Columbia, Canada. The customer has an Engineering and Maintenance Department which plays a critical role in ensuring the city’s infrastructure, including water supply systems, is well-maintained and resilient.

The department’s commitment to providing water to pump stations in the event of an earthquake showcases its dedication to preparedness and the safety of their residents.

Ready for the Shake: A Case Study on Vendor's Earthquake-Prepared Water Pumping Station for Municipal Resilience

Water Supply Resilience:

The Engineering and Maintenance Department recognizes the importance of maintaining a reliable water supply, especially during emergencies like earthquakes. They prioritize the resilience of the city’s water infrastructure to ensure continuous access to safe drinking water.

Emergency Response Planning:

The department develops comprehensive emergency response plans, including specific strategies for earthquake scenarios. These plans outline the steps and protocols to be followed in the immediate aftermath of an earthquake to ensure the uninterrupted operation of pump stations and water distribution systems.

Seismic Upgrades and Retrofitting:

To enhance the resilience of critical infrastructure, the department focuses on seismic upgrades and retrofitting of pump stations. This involves assessing the vulnerability of pump stations to seismic events and implementing engineering measures to strengthen their structures, ensuring they can withstand earthquakes and continue functioning.

Communication and Collaboration:

The Engineering and Maintenance Department works closely with other city departments, emergency management agencies, and utility providers to coordinate efforts and develop effective communication channels during emergencies. This collaborative approach enables the sharing of information and resources to address water supply challenges in the aftermath of an earthquake.

Training and Preparedness:

The department conducts regular training programs for staff members involved in water infrastructure operations and maintenance. This training ensures they are well-prepared to respond effectively during emergencies, including earthquake events. It covers procedures for assessing damages, restoring services, and implementing emergency measures to ensure water supply continuity.

Public Awareness and Education:

Recognizing the importance of public awareness, the department actively engages with the community to educate residents on the importance of earthquake preparedness and water supply resilience. They provide information on how individuals can prepare themselves and their households for emergencies, including storing emergency water supplies and understanding the role of the city in maintaining water services during and after an earthquake.

By focusing on preparedness, retrofitting, backup power supply, collaboration, training, and public education, the municipality Engineering and Maintenance Department demonstrates a strong commitment to ensuring the provision of water to pump stations in the event of an earthquake. Their efforts contribute to the city’s overall resilience and the safety of its residents.

QCAi Work

Addressing these challenges requires collaboration between engineers, system integrators, and experts in earthquake-resistant design and SCADA systems.

By considering seismic considerations, communication resilience, power supply redundancy, monitoring capabilities, redundancy mechanisms, emergency protocols, and thorough testing, a robust SCADA solution can be designed and built to control assets efficiently and reliably in the event of an earthquake.

Here’s how QCA Systems supports customers in this area:

QCA Systems began by understanding the specific requirements of the project. This involves collaborating closely with the client, including water utility experts and stakeholders, to determine the desired functionalities, performance goals, and regulatory compliance requirements.

  1. SCADA Architecture: QCA Systems designed the SCADA system architecture and, considered factors such as scalability, fault tolerance, and disaster recovery. Redundancy and failover mechanisms were incorporated to ensure the system remains operational during and after an earthquake.
  2. Communication Infrastructure: QCA Systems designed a robust communication infrastructure that can withstand seismic events. This included a combination of wired and wireless communication technologies, selecting reliable protocols, and implementing redundant communication paths to maintain connectivity.
  3. RTU Selection: QCA Systems selected RTUs that are rugged, reliable, and capable of withstanding seismic events. These RTUs should have the necessary input/output capabilities to monitor and control the pumping assets effectively.
  4. Power Supply: QCA Systems designed power supply redundancy and backup systems to ensure continuous operation during power outages caused by earthquakes. This involved backup generators, uninterruptible power supplies (UPS), or other alternative power sources.
  5. Monitoring and Alarming: The SCADA system was designed to monitor critical parameters related to water pumping assets. This includes integrating sensors and instruments capable of detecting seismic activity, asset operating conditions, and other relevant data. Alarming mechanisms were implemented to provide immediate notifications of anomalies or faults.
  6. Data Logging and Visualization: QCA Systems designed a data logging and visualization system to capture and display real-time data from the pumping assets. This included developing user-friendly interfaces and dashboards that provide operators with comprehensive information for monitoring and controlling the assets effectively.
  1. Hardware Integration: QCA Systems procured and integrated the selected RTUs, communication equipment, and other hardware components into the SCADA system infrastructure. 
  1. Software Integration: The selected SCADA software was configured and customized to align with the specific needs of the water pumping assets. This included programming logic, setting up communication protocols, and integrating with third-party systems where required.
  2. Testing and Validation: QCA Systems performed rigorous testing, including simulation exercises, to validate the functionality and reliability of the SCADA system under earthquake conditions. This ensures that the system performed as expected, detects faults, and responds appropriately.

Commissioning and Training: Once the SCADA system was built and tested, QCA Systems assisted in the commissioning phase, ensuring a smooth transition to operational use. We provided training to the client’s personnel on operating the SCADA system, responding to alarms, and implementing emergency procedures during earthquake events.

Ongoing Support and Maintenance: QCA Systems provided ongoing support, including maintenance services, software updates, and system upgrades. We ensured that the SCADA system remained up-to-date, optimized, and capable of effectively controlling the assets in the long term.

Throughout the process, QCA Systems collaborated closely with the client, stakeholders, and relevant experts to ensure that the SCADA solution meets the specific requirements of controlling water pumping assets in an earthquake-prone area.

Key Results

QCA Systems still provides ongoing support and maintenance of this system

  • QCA performed requirement gathering to get optimal solution organized.
  • SCADA architecture was scalable and fault tolerant.
  • Communications infrastructure was robust.
  • RTU hardware selection was thorough.
  • Redundant power supply technologies had to be incorporated.
  • Monitoring and alarming was built in the design.
  • Data Logging and Visualization are key components.
  • Testing and validation of the solution took time.
  • Commissioning and training was done collaboratively

More Case Studies

Let's Work Together